Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
Portage Lake Lift Bridge lane closures next week
May 12, 2022
Motorists should expect closures of the outside northbound and southbound lanes on the bridge Monday through Friday. Some full traffic closures of up to 10 minutes may be required for bridge moves at non-peak traffic times during the day. Some full traffic closures of up to 15 minutes may be done at night for bridge moves between 10 p.m. and 5 a.m. These bridge movements will result in delays for vehicle, pedestrian, and bicycle traffic.
The lane and traffic closures will allow for curb work on the lower bridge deck and testing of the electrical systems.
This work is part of the ongoing repair project (expected to be completed in early June) to help ensure continued safe and reliable operation of the bridge.
Media Contact: