I-94 Drainage Tunnel (DB)
Project information
Scope
I-94 from Burns Avenue to Barrett Avenue, 5,700’ 14.5-ft diameter soft ground drainage tunnel, launch shaft, retrieval shaft, two offline drop shafts, junction chamber, pump station, adit tunnel connections, and associated work.
Job number
222848
Control section
82025
Delivery method
Design-Build
Contacts
Miranda Spare |517-243-4051
Innovative Contracting Project Manager
Adam Wayne | 248-234-3478
I-94 Senior Project Manager
Estimated cost
Construction cost: $161,000,000
Anticipated schedule
Industry forum: June 2025
Issue request for qualifications (RFQ): August 2025
Statement of qualifications (SOQ): September 2025
Notification of short-listed submitters: September 2025
Issue request for proposals (RFP): October 2025
Proposals due: February 2026
Anticipated contract award: March 2026
Project attributes
DBE goal: TBD
Stipend: TBD
*Anticipated prequalification
Project specific qualifications satisfying minimum threshold requirements for at least three soft ground Tunneling Projects with geotechnical monitoring, completed in the United States and/or Canada of similar scope and complexity using an Earth Pressure Balance Tunnel Boring Machine with a segmental tunnel liner that reached completion or substantial completion within the last ten (10) years as either the Lead Contractor or a Major Participant to the Lead Contractor.
Subclassifications
- (Fd) Pumphouses
- (Ea) Grading, Drainage Structures & Agg. Cons
- (Fa) Bridges and Special Structures
*Anticipated primary professional service prequalification
Project specific qualification satisfying a minimum threshold for technical capability as having completed final design of at least three soft ground Tunneling Projects in the United States or and/Canada of similar scope and complexity that reached completion or substantial completion within the last ten (10) years as either the Lead Engineering Firm or a Major Participant to the Lead Engineering Firm.
*Anticipated secondary professional service prequalification
Project specific qualification satisfying a minimum threshold for technical capability as having completed hydraulic, venting, and transient modeling of at least three Drainage Tunnel Projects in the United States and/or Canada of similar scope and complexity that reached completion or substantial completion within the last ten (10) years as either the Lead Engineering Firm or a Major Participant to the Lead Engineering Firm
- Design: Roadway
- Design - Geotechnical: Advanced
- Design - Hydraulics II
- Design - Traffic: Non-Freeway Signing
- Design - Traffic: Work Zone Maintenance of Traffic
- Design - Traffic: Work Zone Mobility and Safety
- Design - Utilities: Pump Stations
- Design - Utilities: Municipal
- Design - Utilities: Lighting
- Design - Buildings
- Surveying: Construction Staking
- Surveying: Right of Way
- Surveying: Roadway