The web Browser you are currently using is unsupported, and some features of this site may not work as intended. Please update to a modern browser such as Chrome, Firefox or Edge to experience all features Michigan.gov has to offer.
Haywire Landfill (Manistique, Schoolcraft County)
Please contact the Site Lead for the most up-to-date status of this site.
EGLE site lead
Mary Ann St Antoine, StAntoineM@Michigan.gov or 989-370-8035.
Waste Disposal Questions
Haywire Landfill – only takes paper sludge: 906-286-0179
Background
Haywire Landfill, located on M-94 north of Manistique, has operated since 2003, as a Type III low-hazard industrial waste landfill. The landfill is currently 28 acres and receives paper mill residual material (also called paper pulp). Due to historical groundwater contamination at this site, including boron, total inorganic nitrogen, and arsenic, and the fact that paper mill residuals often contain PFAS chemicals, EGLE requested that the Haywire Landfill sample groundwater for PFAS, which was done in June 2021.
Groundwater flows to the east – northeast towards the Manistique River.
Content posted October 2022.
Site map
See an aerial view of the location of the site.
Drinking water
There are no residential wells located downgradient or side gradient of the landfill.
Anticipated activities
EGLE will request the Landfill to collect samples from wells located on the border of the landfill, to help delineate the plume of contamination and to determine if any PFAS contamination has left the site.
Historical timeline
-
2021
- On June 9, 2021, the Haywire Landfill consultant, Bittner Engineering, Inc., collected groundwater samples from four monitoring wells.
-
2022
- On August 19, 2022, EGLE received the results of the June 9, 2021, sampling event. Upgradient monitoring well MW-15 was non-detect for PFAS. Samples from the other three monitoring wells had results that were above the Groundwater Cleanup Criteria, the highest of which was 64 ppt PFOA and 95 ppt PFOS.
Sampling Results Summary
Type of Sample
Date Sampled
(or range)Number of Sample Results Received
Number of Samples above Criteria*
Groundwater Monitoring Wells
June 9, 2021
4
3
* Residential well and groundwater monitoring well results are compared to EGLE Part 201 criteria for 7 PFAS compounds effective 12/21/2020: PFOS (16 ppt), PFOA (8 ppt), PFNA (6 ppt), PFHxS (51 ppt), PFHxA (400,000 ppt), PFBS (420 ppt), and HFPO-DA (370 ppt).
Sampling Notes
- None at this time.