Skip Navigation
Michigan Department of TransportationVisit www.michigan.gov!
Michigan.gov Home MDOT Home |  Site Map |  Contact MDOT |  FAQ |  State Web Sites
close print view

MDOT to study Ironwood US-2 BR/Lowell Street intersection as four-way stop

Contact: James Lake, MDOT Office of Communications,
lakej1@michigan.gov
906-786-1830, ext. 323,

Agency: Transportation


Fast Facts:
- Traffic signals at three US-2 BR intersections in Ironwood are in flash mode for 90 days.
- Traffic volumes and other criteria will be reviewed to determine if the signals are needed.
- Unwarranted signals have been shown to cause unnecessary delay and increase crashes.

April 12, 2012 -- After studying traffic at three signals on the US-2 Business Route (BR) in Ironwood for about a month, the Michigan Department of Transportation (MDOT) also will now study US-2 BR/Lowell Street as a four-way stop. Motorists are urged to use extra caution at these intersections during the study period.

To determine whether three traffic signals on US-2 BR in Ironwood are needed, MDOT placed them in flashing mode for 90 days beginning March 8. Two other intersections - US-2 BR at Ayer Street and at Aurora Street/Suffolk Street - are operating as four-way stops with a flashing red light for all directions. A final determination on all the intersections will be made following the study period.

MDOT will review traffic volumes, delays, back-ups and crash data at the three intersections to determine if the signals are warranted. Preliminary review of the signals suggests the signals do not meet criteria for signals based on traffic volumes, pedestrian volumes, school crossings, crashes, and the overall roadway network.

At the end of the signal study, if the signals are found to be warranted, MDOT will continue to operate and maintain them. However, if the signals are deemed unwarranted, they will be removed. The signals could be reinstalled in the future if traffic patterns were to change and justify their addition.

Don't Barrel Through Work Zones! - Drive Smart to Stay Alive.

Related Content
 •  M-43 bridge repairs over US-131 start Monday in Oshtemo Township
 •  MDOT to hold public meeting on new pedestrian crossing on M-3 (Gratiot Avenue) in Macomb County
 •  I-75 resurfacing job in Mackinac County starts today
 •  M-15 Heritage Route trail work begins next week
 •  M-11 (28th Street) reconstruction progresses to third stage
 •  I-94 pavement repair at US-24 (Telegraph Road) expected to begin weekend of June 22
 •  I-75 resurfacing begins Monday night in Detroit
 •  M-88 resurfacing planned in Antrim County
 •  M-59 project near Hartland to start this weekend
 •  New world record attempt Aug. 3 at Mackinac Bridge
 •  MDOT suspends construction for June race at Michigan International Speedway (MIS)
 •  MDOT promotes on-road bicycling facilities
 •  Eastbound I-69 patching begins Monday
 •  Maintenance work on northbound M-1 (Woodward Avenue) starts Monday in Detroit
 •  Plainfield Avenue resurfacing work starts Monday in Grand Rapids
 •  MDOT open house on Wednesday for I-94 interchange design at 40th Street in Charleston Township
 •  M-53 (Van Dyke Avenue) detour extended for culvert replacement in Macomb County
 •  Second phase of M-53 reconstruction to begin in Bad Axe
 •  MDOT to host M-65 open house June 24 in Whittemore
 •  MDOT holds public workshop to discuss road safety option for Old US-27 in DeWitt
QR code

Michigan.gov Home |  MDOT Home |  Site Map |  FAQ |  State Web Sites |  Office of Regulatory Reinvention |  Spending & Accountability
Privacy Policy |  Link Policy |  Accessibility Policy |  Security Policy | Michigan News | Michigan.gov Survey


Copyright © 2001-2013 State of Michigan