Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationMichigan.gov banner
Michigan.gov Home MDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version Email this page Email Page
I-75 Corridor, Oakland County Environmental Study
I-75Overview
The I-75 corridor in Oakland County continues to be the focus of major growth of all sorts. An I-75 Corridor Feasibility Study, completed in November 2000, articulated the need for additional freeway capacity in Oakland County to provide safe and efficient traffic movement.
Future phases of this project will provide continued opportunities for input and participation

Public involvement

• 07/19/05 Final Public Meeting PDF icon

• MDOT's response to a citizen-sponsored meeting held 08-18-2004 PDF icon

• 01/27/2004 public hearing PDF icon
A Public Hearing was held January 27, 2004 at the Troy Marriot on Big Beaver Road two blocks east of I-75.

• 01/27/2004 public hearing, legal notice PDF icon

• 8/29/2002 Scoping Meeting Notes PDF icon

• 8/21/2002 Public Meeting: Power Point Presentation
Slide 1, Slide 2, Slides 3-13, Slides 14-21

• 06/06/2002 and 06/05/2002 Meetings Power Point Presentation

• Previously Held Public/Scoping Meetings

Documents

• Record of Decision (ROD) PDF icon
Record of Decision (ROD) and Signature Page PDF icon

• Project Area Map PDF icon

• Final Environmental Impact Statement (FEIS)
06-06-2005 The Final Environmental Impact Statement (FEIS) is now available.

• Draft Enviromental Impact Statement

• Draft Enviromental Impact Statement Summary PDF icon

• Project Schedule PDF icon

• Frequently Asked Questions PDF icon

• Work Plan PDF icon

• Notice Of Intent PDF icon

• Technical Memorandum No. 2:
Refined Analysis of Transit and HOV Concepts

October 2002

• Power Point Presentation presented in conjunction with Technical Memorandum 2
October 2002

• Technical Memo No. 1
Pages 1-23, Pages 24-43

• I-75 Corridor Feasibility Study, Final Report completed Nov. 2000

I-75 Council

• 11/20/2003 Meeting Notes PDF icon

• 06/05/2003 Meeting Notes PDF icon

• 07/30/2002 Meeting Power Point Presentation

• 07/30/2002 Meeting Notes PDF icon

• 05/22/2002 Meeting Notes PDF icon

Scoping Information (March, 2003 Version)

• Contents PDF icon

• Chapters 1-6 PDF icon

• Chapters 7-9 PDF icon

• Chapters 10-19 PDF icon

• Chapters 20-28 PDF icon

• Appendix PDF icon

Scoping Information, ( August 2002)

• Cover PDF icon

• Contents PDF icon

• Main document PDF icon

• Appendix PDF icon


Link to Department and Agencies Web Site Index
Link to Statewide Online Services Index
Link to Statewide Web-based Surveys
Link to RSS feeds available on this site
Quick Links
 •  Lane Closures
 •  MI Drive
 •  State Map
 •  Detroit Traffic
 •  Online Services
 •  Report a Pothole
 •  Supplemental Specifications / Special Provisions
 •  Jobs with MDOT
 •  Bid Letting
 •  Damage Claim
 •  Construction Contract Inquiry

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2008 State of Michigan