|
|  |
Printer Friendly
Text Version Email Page
| Lansing Road (Old 27) - Eaton County |
What we are doing: Road improvements along Lansing Road (Old 27).
How traffic is affected:
- Lansing Road will be closed to northbound and southbound through-traffic from the I-69 interchange in Charlotte to Stewart Road, and from southwest of N. Royston Road to Pinch Highway. Traffic will be detoured using I-69 when Lansing Road is closed.
- For local traffic only, on Lansing Road, one lane northbound will be maintained at all times, except for the existing boulevard section in Potterville. In the boulevard section, one lane of traffic will be maintained in each direction using traffic shifts.
- Access will be maintained to all residences and businesses along Lansing Road during construction.
Start: Mid-April 2008 End: November 2008.
|
Contact Us: Lansing Transportation Service Center - 517-324-2260
For daily closure information, visit MDOT's lane closure pages
View Project Map and Brochure
Improvements include:
- Pavement rehabilitation, new curb and gutter, drainage work, intersection and utility improvements, and traffic signal upgrades
- Lansing Road, through the city of Potterville, will be reconfigured from the existing boulevard to three lanes
- Removal of the southbound Lansing Road bridge over the Thornapple River
- Deck replacement and widening of the northbound bridge over the Thornapple River
|
|
 |
|