Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationMichigan.gov banner
Michigan.gov Home MDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version Email this page Email Page
< Back to Construction & Technology Page
FAQ
  Construction & Technology
Q 3. Is the time drivers spend transporting materials or equipment from one Davis-Bacon project to another Davis-Bacon project covered?
 
Answer:
Generally, no. Again the regulatory definition of "construction …" specifically states that the transportation of materials or supplies to or from the "site of the work" is not considered construction (29 CFR 5.2(l)(2). Nevertheless, there may be some instances where the two sections of highway construction are contiguous and the transportation of materials or equipment is all on the "site of the work" of both sections that constitute a combined covered project.

Link to Department and Agencies Web Site Index
Link to Statewide Online Services Index
Link to Statewide Web-based Surveys
Link to RSS feeds available on this site
FAQ Categories
 •  About MDOT
 •  Auctions
 •  Bids & Contracts
 •  Bridges
 •  Bridge Operations
 •  Construction
 •  Construction Permits
 •  Construction & Technology
 •  Courtesy Patrol
 •  Driver Information
 •  Freedom of Information Act
 •  Highway Advertising Signs
 •  Highway Maintenance
 •  Local Agency Programs
 •  Logo Signs & Tourist Oriented Signs
 •  Mackinac Bridge
 •  MiRLAP
 •  Political Signs
 •  Potholes
 •  Rail Safety
 •  Rideshare
 •  Roads
 •  Safety Programs
 •  Traffic Signals
 •  Traffic Signs & Delineation
 •  Traffic & Safety
 •  Workzone Speed Limits

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2008 State of Michigan