| Examples |
1-acre filter strip in a 15-year contract. Installation cost was $80. |
1-acre field windbreak in a 14-year 6-month contract. Installation cost was $300. |
1-acre riparian buffer strip offered on marginal pastureland in Huron County in a 15-year contract. Installation cost was $400. |
Base SRR
Weighted average soil rental rate (SRR) per acre for top three soils present in the contract area |
$100 |
$80 |
Marginal Pastureland Rates are pre-set for each county, for Huron County it is $40 per acre. |
Bonus
SRR x 40% |
$40 |
$32 |
$16 |
Maintenance
$5-$10 |
$5 |
$5 |
$7 |
| Total |
$145 |
$117 |
$63 |
SIP
Signing Incentive Payment (SIP) is $140 or $150 per acre based on contract length |
$150 |
$140 |
$150 |
PIP
Practice Incentive Payment (PIP) is total eligible practice installation cost x 40% |
$32 |
$120 |
$160 |
Cost-Share
Total eligible practice installation cost x 50% |
$40 |
$150 |
$200 |
Cost-Share
Total eligible practice installation cost x 50% |
$40 |
$150 |
$200 |